欧美一区二区午夜福利在线,精品国产欧美日韩不卡在线观看,精品国产野战一区二区三区,欧美日本高清在线不卡视频,99热久久这里只有精品,人妻少妇中文字幕在线一区,精品综合欧美一区二区三区,久久久久国产精品免费免费播放,久久精品少妇夫妻一区二区三区


92713 BEHATEST High Voltage Proving Unit

Model:92713
Price:0US$

● 92713 DC High Voltage Generator/DC high voltage output box
● 500V/1000V/2500V/5000V/DC voltage verification unit
● Designed to proof :
-phasing sticks.
-high voltage detectors (contact type only, not to be used with non contact proximity detectors).
-high voltage and voltage testers.
 Details



BEHATEST High Voltage Proving Unit / DC Voltage Generator

Model: 92713


Introduction:
The high voltage proving unit for high voltage testers is utilized to determine if the devices under test are functionally working.
The high voltage proving unit is not a calibrator and can't be utilized for calibration.
The high voltage proving unit for high voltage testers can be utilized to proof contact devices on a momentary basis (press on, check, release).

Features:
● 500V/1000V/2500V/5000V/DC voltage verification unit
● Designed to proof :
  -phasing sticks.
  -high voltage detectors (contact type only, not to be used with non contact proximity detectors).
  -high voltage and voltage testers.
● Battery operated.
● Led indicates when power is "ON".
● Small and hand held.
● Quick connection with normal 4mm test leads.

Technical Data:
Voltage Settings 
(Internal Jumpers Selectable)   
500 V/DC
1000 V/DC
2500 V/DC
5000 V/DC (default setting)
Over-Current Protection
Yes
Power on Indicator
Yes
Operating Temperature
- 5 to 45
Storage Temperature
- 10 to 85
Power supply
6 x 1.5 V, IEC LR6
Dimensions
205 x 90 x 55 mm
Weight
Approx. 510g ( battery included)
 
Scope of Supply:
1 pc High voltage proving unit 92713
2 pc Test leads With Crocodile Clamps
6 pc Batteries 1.5 V, IEC LR6
1 pc Instruction Manual


Example1:


Proofing 9007KB Series - Multifunction Voltage Testers
The master pole must be connected to the positive socket of the proofing unit.
The slave pole must be connected to the negative socket of the proofing unit.
The test button of the proofing unit must be depressed for a short time only.
During that short time, the neon voltage detector must lit and the panel meter must deviate and show increase in the voltage, then come back down.


Example2:


Proofing 9007KB Series - Voltage Testers
The master pole must be connected to the positive socket of the proofing unit.
The earth prod (or earth wire) must be connected to the negative socket of the proofing unit.
The test button of the proofing unit must be depressed for a short time only.
During that short time, the neon voltage detector must lit and the panel meter must deviate and show increase in the voltage, then come back down.






 

 
 

  |About us | Contact | Copyright © 2011 Shanghai Beha Electronics Co.,Ltd |

邵东县| 大同县| 乐安县| 阿城市| 赞皇县| 易门县| 胶州市| 林甸县| 邯郸县| 云南省| 瑞丽市| 疏附县| 永昌县| 连山| 鄄城县| 盐池县| 伊川县| 广南县| 通州市| 峨边| 周宁县| 子洲县| 东莞市| 静宁县| 沁源县| 辛集市| 同心县| 庆云县| 钟祥市| 山东省| 宿松县| 锡林浩特市| 长岛县| 平乡县| 石柱| 常德市| 永泰县| 山阴县| 紫金县| 庄浪县| 正镶白旗|