欧美一区二区午夜福利在线,精品国产欧美日韩不卡在线观看,精品国产野战一区二区三区,欧美日本高清在线不卡视频,99热久久这里只有精品,人妻少妇中文字幕在线一区,精品综合欧美一区二区三区,久久久久国产精品免费免费播放,久久精品少妇夫妻一区二区三区


92713 BEHATEST High Voltage Proving Unit

Model:92713
Price:0US$

● 92713 DC High Voltage Generator/DC high voltage output box
● 500V/1000V/2500V/5000V/DC voltage verification unit
● Designed to proof :
-phasing sticks.
-high voltage detectors (contact type only, not to be used with non contact proximity detectors).
-high voltage and voltage testers.
 Details



BEHATEST High Voltage Proving Unit / DC Voltage Generator

Model: 92713


Introduction:
The high voltage proving unit for high voltage testers is utilized to determine if the devices under test are functionally working.
The high voltage proving unit is not a calibrator and can't be utilized for calibration.
The high voltage proving unit for high voltage testers can be utilized to proof contact devices on a momentary basis (press on, check, release).

Features:
● 500V/1000V/2500V/5000V/DC voltage verification unit
● Designed to proof :
  -phasing sticks.
  -high voltage detectors (contact type only, not to be used with non contact proximity detectors).
  -high voltage and voltage testers.
● Battery operated.
● Led indicates when power is "ON".
● Small and hand held.
● Quick connection with normal 4mm test leads.

Technical Data:
Voltage Settings 
(Internal Jumpers Selectable)   
500 V/DC
1000 V/DC
2500 V/DC
5000 V/DC (default setting)
Over-Current Protection
Yes
Power on Indicator
Yes
Operating Temperature
- 5 to 45
Storage Temperature
- 10 to 85
Power supply
6 x 1.5 V, IEC LR6
Dimensions
205 x 90 x 55 mm
Weight
Approx. 510g ( battery included)
 
Scope of Supply:
1 pc High voltage proving unit 92713
2 pc Test leads With Crocodile Clamps
6 pc Batteries 1.5 V, IEC LR6
1 pc Instruction Manual


Example1:


Proofing 9007KB Series - Multifunction Voltage Testers
The master pole must be connected to the positive socket of the proofing unit.
The slave pole must be connected to the negative socket of the proofing unit.
The test button of the proofing unit must be depressed for a short time only.
During that short time, the neon voltage detector must lit and the panel meter must deviate and show increase in the voltage, then come back down.


Example2:


Proofing 9007KB Series - Voltage Testers
The master pole must be connected to the positive socket of the proofing unit.
The earth prod (or earth wire) must be connected to the negative socket of the proofing unit.
The test button of the proofing unit must be depressed for a short time only.
During that short time, the neon voltage detector must lit and the panel meter must deviate and show increase in the voltage, then come back down.






 

 
 

  |About us | Contact | Copyright © 2011 Shanghai Beha Electronics Co.,Ltd |

曲靖市| 门头沟区| 高清| 元氏县| 成都市| 泽州县| 花莲县| 日土县| 四平市| 讷河市| 九江市| 新密市| 英德市| 东莞市| 龙川县| 望城县| 灯塔市| 渭源县| 长葛市| 揭阳市| 镇赉县| 清新县| 宜兰县| 虞城县| 鱼台县| 青岛市| 荥阳市| 赤城县| 淳安县| 内乡县| 桃江县| 垦利县| 鄱阳县| 准格尔旗| 临高县| 乌鲁木齐县| 班戈县| 衡水市| 天津市| 金平| 昌江|